EBBW Junction – Road Rail Access Points

LCI Rail were commissioned to install Road Rail Access Points at EBBW Junction.

We installed 2 RRAPs and each of these were 10.8m in length. These were to be installed on the up and down main line at the site.

Whilst working on this job, we also installed troughing protection using 10 Galvanised Steel Plates. We used MOT Type 1 Stone for the apron approach to the RRAP in 6 Foot and apron approach in the CESS.